• About
  • Advertise
  • Jobs
Tuesday, July 21, 2026
No Result
View All Result
KashmirPEN
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
KashmirPEN
No Result
View All Result
ADVERTISEMENT
Home State News

330-MW Kishanganga HEP in final stages of commissioning, CS reviews progress

Kashmir Pen by Kashmir Pen
8 years ago
in State News
Reading Time: 1 min read
HCC playing truant over New Ganderbal Hydroelectric Project: Jammu and Kashmir government
0
SHARES
1
VIEWS
Share on FacebookShare on Twitter

JAMMU: 01 Mar 2018

ADVERTISEMENT

Chief Secretary, B B Vyas Wednesday reviewed the progress of the 330-MW Kishanganga HEP being constructed in Gurez area of Bandipora district, which has reached its final stages of commissioning.

The 330MW Kishanganga HEP envisages diversion of river Kishanganga from Gurez valley into an underground powerhouse with 3 units of 110MW each and discharging the tail water in Wullar Lake.

Commissioner/Secretary Revenue, Secretary PHE and I&FC, MD JKSPDC and other senior officers were present. Divisional Commissioner, Kashmir, DC Bandipora, Chief Engineer, I&FC and NHPC Authorities participated in the meeting via video conferencing.

The implementation of Resettlement and Rehabilitation (R&R) Plan of the Project Affected families was discussed in the meeting besides progress of work on the treatment of Madhumati and Bonar Nallah to improve its discharge capacity and to protect the Nallah boundaries against high discharge was also reviewed.

Previous Post

After six days search bodies of three missing persons recovered in Lashkote

Next Post

Atifa Nazir Ahanger Kashmiri Lady Who Left Her Job In MNC To Live Her Passion For Designing. An excerpt from an interaction with Gyawun

Kashmir Pen

Kashmir Pen

Next Post
Atifa Nazir Ahanger Kashmiri Lady Who Left Her Job In MNC To Live Her Passion For Designing. An excerpt from an interaction with Gyawun

Atifa Nazir Ahanger Kashmiri Lady Who Left Her Job In MNC To Live Her Passion For Designing. An excerpt from an interaction with Gyawun

ADVERTISEMENT
Facebook Twitter Youtube RSS

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ

No Result
View All Result
  • Home
  • Latest News
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ