• About
  • Advertise
  • Jobs
Friday, July 17, 2026
No Result
View All Result
KashmirPEN
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
KashmirPEN
No Result
View All Result
ADVERTISEMENT
Home State News

Commissioner SMC reviews AMRUT works

Kashmir Pen by Kashmir Pen
6 years ago
in State News
Reading Time: 1 min read
Commissioner SMC reviews AMRUT works
0
SHARES
5
VIEWS
Share on FacebookShare on Twitter

Commissioner Srinagar Municipal Corporation (SMC), Gazenfar Ali, today reviewed progress of various projects under AMRUT scheme.

The status of all the works under AMRUT that included Sewerage and Septage, Drainage sector, Rejuvenation of Brari Nambal, Urban Transport sector, Green Space sector, Water Works sector and other issues were discussed at length.

ADVERTISEMENT

The Commissioner was informed that out of the total number of thirty projects that have been identified under AMRUT, 16 stand completed and 7 projects have 80 percent physical progress and four shall be completed by the month of September 2020.

Regarding STP’s   he was informed that both STP’s one at Achan and the other at Aaluchibagh are completed and fully functional.

While reviewing the status of walkways the meeting was informed that walkways at Peerbagh, Tengpora, Rambagh and Shireen bagh have been completed and an idle parking in Pantha Chowk is also completed.

Commissioner SMC directed all the concerned wings to expedite the progress of remaining works and complete them within the stipulated time.

The meeting was attended by Joint Commissioner (works), SE Drainage, ADP Planning, all Executive Engineers, representatives of SDA, LAWDA, Floriculture, UEED and others.

Previous Post

Altaf Bukhari condoles demise of G.H Mir’s spouse’s sister-in-law Expresses solidarity with bereaved family

Next Post

60 CRPF, 11 Cops among 260 new covid-19 cases in JK, tally at 7497

Kashmir Pen

Kashmir Pen

Next Post
Health Ministry recommends anti-malarial drug for COVID-19; removes anti-HIV drugs

60 CRPF, 11 Cops among 260 new covid-19 cases in JK, tally at 7497

ADVERTISEMENT
Facebook Twitter Youtube RSS

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ

No Result
View All Result
  • Home
  • Latest News
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ