• About
  • Advertise
  • Jobs
Wednesday, April 22, 2026
No Result
View All Result
KashmirPEN
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
KashmirPEN
No Result
View All Result
ADVERTISEMENT
Home Latest News

DC B’la reviews progress of works under Jal Jeevan Mission

Kashmir Pen by Kashmir Pen
3 years ago
in Latest News, State News
Reading Time: 2 mins read
DC B’la reviews progress of works under Jal Jeevan Mission
0
SHARES
4
VIEWS
Share on FacebookShare on Twitter

In order to take an appraisal of the progress of effective implementation of Jal Jeevan Mission (JJM) scheme in the district, the Deputy Commissioner (DC) Baramulla, Dr Syed Sehrish today presided over a meeting of concerned officers at DC Office Complex here.

At the outset, the DC was apprised through Power Point Presentation with regard to the physical and financial progress of the works being executed under the JJM.

It was also given out that 107050 households have been provided with portable water connection in the district till date against the set target of 145696.

ADVERTISEMENT

Asserting that JJM is a major flagship programme to cover all households, Dr Sehrish directed all the officers to work in coordination and ensure smooth execution of JJM works in their areas.

She directed officers of all concerned departments to ensure that all households are connected through tap water, besides all pending schools, anganwadi centres, health centres and panchayat ghars be also provided with tap water connections under JJM scheme across the district.

She also directed the executing agencies to redouble their efforts so that cent percent saturation and desired target is achieved within the stipulated time frame.

Meanwhile, various issues and bottlenecks were comprehensively discussed wherein DC exhorted upon the officers to carry on the works with minimum inconvenience to the public.

Joint Director Planning M Yousuf Rather, Superintending Engineers Jal Shakti Department, Chief Medical officer, Executive Engineers and other functionaries of concerned departments were present in the meeting.

Previous Post

Junior Boys National Boxing championships: Haryana Boxers shine on day 2

Next Post

More than 500 PACS to be computerized soon: Officers to CS

Kashmir Pen

Kashmir Pen

Next Post
More than 500 PACS to be computerized soon: Officers to CS

More than 500 PACS to be computerized soon: Officers to CS

Leave Comment
ADVERTISEMENT
Facebook Twitter Youtube RSS

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ

No Result
View All Result
  • Home
  • Latest News
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ