• About
  • Advertise
  • Jobs
Wednesday, September 30, 2026
No Result
View All Result
KashmirPEN
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
KashmirPEN
No Result
View All Result
ADVERTISEMENT
Home State News

Div Com inspects ongoing works of Tawi River Front project

Kashmir Pen by Kashmir Pen
4 years ago
in State News
Reading Time: 1 min read
Div Com inspects ongoing works of Tawi River Front project
0
SHARES
15
VIEWS
Share on FacebookShare on Twitter

Divisional Commissioner Jammu, Ramesh Kumar today inspected the progress of ongoing works on Tawi River Front View project being executed by Jammu Smart City Limited (JSCL) under Smart City Mission of Ministry of Housing and Urban Affairs (MoHUA).

The Div Com was accompanied by Commissioner Jammu Municipal Corporation (JMC) & CEO JSCL, Rahul Yadav; consultants; site engineers besides other concerned officials.

During the visit, the concerned engineers apprised the Div Com about the work completed so far besides future work plan.

It was informed that the sufficient manpower has been deputed for expeditious work on the project while the work is going on in double shifts.

It was informed that work on machinery mobilization, grating, centre making, topographic survey benchmarks has been completed while work on construction of Diaphragms is in progress.

The Divisional Commissioner took a round of various spots and inspected the work.

ADVERTISEMENT

He directed concerned officials to clear all the bottleneck if any and expedite the pace of works for timely completion of the prestigious project. 

He also instructed them to ensure quality parameters of each work.

Previous Post

Lt Governor meets Para Athlete Irfan Ahmad Mir

Next Post

DC Srinagar rolls out Activities for Har Ghar Tiranga Programme

Kashmir Pen

Kashmir Pen

Next Post
Don’t leave office during working hours without permission: DC Srinagar to officials

DC Srinagar rolls out Activities for Har Ghar Tiranga Programme

Leave Comment
ADVERTISEMENT
Facebook Twitter Youtube RSS

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ

No Result
View All Result
  • Home
  • Latest News
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ