• About
  • Advertise
  • Jobs
Wednesday, September 2, 2026
No Result
View All Result
KashmirPEN
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
KashmirPEN
No Result
View All Result
ADVERTISEMENT
Home State News

Div Com Kashmir reviews progress on Semi Ring road project

Kashmir Pen by Kashmir Pen
5 years ago
in State News
Reading Time: 1 min read
Div Com Kashmir reviews progress on Semi Ring road project
0
SHARES
16
VIEWS
Share on FacebookShare on Twitter

The Divisional Commissioner (Div Com) Kashmir, Pandurang K Pole Friday convened a meeting here to review the progress of the Semi Ring road project, tree cutting and other issues.

ADVERTISEMENT

Meeting was attended in person by Joint Director Geology and Mining, representative of Deputy Commissioner Srinagar, District Mineral Officer Srinagar, Chief Project Manager, NKC Projects Pvt. Ltd, Site Engineer NHAI and Collector PWD, while Deputy Commissioners (DCs) of Pulwama, Baramulla and Budgam attended the meeting through Video Conferencing.

At the outset, the DCs of Baramulla, Pulwama and Budgam gave details of the land identified for the project in their respective districts.

The Div Com directed the concerned to prefer private land or purely proprietary land for the project and identify possible sellers.

Enquiring about the status of tree cutting, the DCs informed that the most of the tree cutting stands completed, however document processing of the rest of the trees is going on.

The Div Com directed the officers to conduct processing of the documents of tree cutting forthwith and ensure cutting of rest of the trees on war-footing basis.

He also instructed the concerned officers to sort out all the issues prior to the next meeting on the subject.

Previous Post

DMRRR to complete transit accommodations, seismic –resilient retrofitting of priority infrastructure by December 2022 : CS

Next Post

600 social media, financial complaints redressed in 2021 : Cyber police Sgr

Kashmir Pen

Kashmir Pen

Next Post
Working from home? Follow these tips to avoid neck, lower back pain

600 social media, financial complaints redressed in 2021 : Cyber police Sgr

Leave Comment
ADVERTISEMENT
Facebook Twitter Youtube RSS

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ

No Result
View All Result
  • Home
  • Latest News
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ