• About
  • Advertise
  • Jobs
Monday, May 25, 2026
No Result
View All Result
KashmirPEN
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
KashmirPEN
No Result
View All Result
ADVERTISEMENT
Home Latest News

‘Hydropower capacity output to triple by next decade’

Kashmir Pen by Kashmir Pen
2 months ago
in Latest News, State News
Reading Time: 1 min read
‘Hydropower capacity output to triple by next decade’
0
SHARES
4
VIEWS
Share on FacebookShare on Twitter

Riyaz Bhat

Srinagar, Mar 27 : The government Friday said that it is in process of tripling the hydroelectric power generation over the next decade.

According to the news agency—Kashmir News Observer (KNO), the concerned minister in the Legislative Assembly informed that a comprehensive road map for the next decade has been drawn and is under implementation. “The UT is on the fast track to triple its installed hydropower capacity by 2035.”

It also said that the UT of J&K has an estimated hydropower potential of around 18000 Megawatts (MWs) out of which around 15000 MWs has been identified.

ADVERTISEMENT

“Out of the identified potential, 3540.15 MWs (24%) has been harnessed or developed till date. This includes 13 projects of aggregate capacity 1197.4 MWs in the UT sector, 6 projects of aggregate capacity 2250 MW in the Central sector and 12 Projects of aggregate capacity 92.75 MW in the IPP (private) sector,” the government said.

It also informed the house that a capacity addition of around 100-150 MW is expected in the IPP (private) sector during this period.

“Consequently, the total installed hydropower capacity of the UT is expected to reach around 11000 MW by 2035,” the government said—(KNO)

Previous Post

Don’t panic, J&K has enough fuel stock: Minister Sharma to people

Next Post

Two Non-Locals Injured in Gas Cylinder Fire at Habakadal, Stable

Kashmir Pen

Kashmir Pen

Next Post
Two Non-Locals Injured in Gas Cylinder Fire at Habakadal, Stable

Two Non-Locals Injured in Gas Cylinder Fire at Habakadal, Stable

Leave Comment
ADVERTISEMENT
Facebook Twitter Youtube RSS

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ

No Result
View All Result
  • Home
  • Latest News
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ