• About
  • Advertise
  • Jobs
Monday, March 16, 2026
No Result
View All Result
KashmirPEN
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
KashmirPEN
No Result
View All Result
ADVERTISEMENT
Home Latest News

KPDCL announces power shutdown in Kashmir parts

Kashmir Pen by Kashmir Pen
2 weeks ago
in Latest News, State News
Reading Time: 1 min read
Power shutdown
0
SHARES
4
VIEWS
Share on FacebookShare on Twitter

Chief Engineer, Distribution, KPDCL has informed that the Shutdown of 33 kV Salia Tap line will be observed due to which power supply to Salia, Hapatnard, Nagbal and adjoining areas will be affected from 09 AM to 01 PM on 28 February 2026.

ADVERTISEMENT

Similarly, shutdown of 33 kV Cheshmashahi-TRC-Nedous line will be observed due to which power supply to Dal area will be affected from 08 AM to 02 PM on 01 March 2026.

Likewise, shutdown of 33 kV Cheshmashahi-TRC line and 33 kV Chesmashahi-Centaur-Buchwara line will be observed due to which power supply to TRC 05-Dal, F#1-Zabarwan Park, F#2-Rajbhawan, F#3-Centaur Hotel, F#4-SKICC, BUC01-Nehru Park, BUC02-Dalgate and BUC03-Dal will be affected from 10 AM to 11 AM and 04 PM to 05 PM on 02 March 2026.

Similarly, shutdown of 33 KV Alusteng-Nagbal line will be observed due to which power supply to Fatehpora, Gadoora, Tulbagh, Chunduna, Shairpathri adjoining areas will be affected from 09 AM to 12 noon on 01 March 2026.

Previous Post

PM Modi to launch nationwide HPV vaccination drive for 14-year-old girls from Ajmer tomorrow

Next Post

J&K fully prepared for HPV vaccination

Kashmir Pen

Kashmir Pen

Next Post
J&K fully prepared for HPV vaccination

J&K fully prepared for HPV vaccination

Leave Comment
ADVERTISEMENT
Facebook Twitter Youtube RSS

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ

No Result
View All Result
  • Home
  • Latest News
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ