• About
  • Advertise
  • Jobs
Sunday, November 22, 2026
No Result
View All Result
KashmirPEN
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
KashmirPEN
No Result
View All Result
ADVERTISEMENT
Home Latest News

NHAI Plans Second 9-km Chenani-Nashri Tunnel at Rs 3,450 Cr 

Kashmir Pen by Kashmir Pen
10 hours ago
in Latest News, State News
Reading Time: 2 mins read
NHAI Plans Second 9-km Chenani-Nashri Tunnel at Rs 3,450 Cr 
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

SRINAGAR 21 Nov : The National Highways Authority of India (NHAI) is planning to construct a second, parallel 9-km tunnel along the Chenani-Nashri axis on the Jammu-Srinagar National Highway at an estimated cost of Rs 3,449.63 crore, connecting Udhampur and Ramban districts, Jammu newspaper,

The proposed tunnel, to be constructed alongside the existing Dr Shyama Prasad Mukherjee Tunnel, is aimed at strengthening the highway infrastructure and expanding its capacity. The project will be taken up using advanced tunnelling technology and is expected to be completed in about four years.

Official sources said the NHAI’s Regional Office in Jammu has prepared the Detailed Project Report (DPR) and forwarded it to the Union Ministry of Road Transport and Highways (MoRTH), New Delhi, through the authority’s national headquarters. Approval is expected by the end of December 2026.

Project Director, NHAI Udhampur Project Implementation Unit, Ish Gupta, told the newspaper that the authority had been entrusted with the construction of a four-lane highway between Jammu and Srinagar. While two four-lane tunnels have already been constructed through the Pir Panjal range at Banihal, the second tunnel on the Chenani-Nashri stretch is yet to be taken up.

ADVERTISEMENT

Gupta said construction is likely to commence in February or March 2027, subject to the requisite approval from the Ministry.

He said the NHAI would invite global tenders immediately after receiving the Ministry’s clearance. The tendering process would require at least 45 days, followed by the evaluation of technical and financial bids before the contract is awarded.

According to Gupta, geological and environmental clearances have already been obtained, while forest clearance is awaited and the process for securing it is being initiated.

He clarified that the construction of the new tunnel would not disrupt traffic through the existing tunnel, nor would motorists be required to take the old Chenani-Kud-Patnitop-Batote road during the construction period.

The proposed tunnel will be located at an adequate distance from the existing structure, ensuring that construction activity does not pose a risk to traffic movement through the operational tunnel, he said.

The clarification assumes significance as reports had suggested that construction could necessitate diverting traffic onto the older, narrower alignment through Kud, Patnitop and Batote, potentially resulting in congestion.

Gupta said the new tunnel would incorporate advanced ventilation systems, automated surveillance cameras, firefighting equipment and modern lighting arrangements, with safety features being given priority.

The existing Chenani-Nashri tunnel, also known as the Dr Shyama Prasad Mukherjee Tunnel, is a 9-km-long double-lane road tunnel. Its construction began in May 2011 and was completed in March 2017 at a cost of around Rs 3,720 crore.

Previous Post

Ulema call for action against unsafe food trade

Next Post

Cyber Police Warn Against Sharing Leaked Private Video of South Kashmir Couple

Kashmir Pen

Kashmir Pen

Next Post
Srinagar Police warns against circulating false claims of desecration of Holy Quran

Cyber Police Warn Against Sharing Leaked Private Video of South Kashmir Couple

Leave Comment
ADVERTISEMENT
Facebook Twitter Youtube RSS

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ

imunify-bot-check
No Result
View All Result
  • Home
  • Latest News
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ