• About
  • Advertise
  • Jobs
Wednesday, September 23, 2026
No Result
View All Result
KashmirPEN
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
KashmirPEN
No Result
View All Result
ADVERTISEMENT
Home State News

Power shutdown

Kashmir Pen by Kashmir Pen
6 years ago
in State News
Reading Time: 1 min read
Power shutdown
0
SHARES
13
VIEWS
Share on FacebookShare on Twitter

Superintending Engineer (Distribution) JPDCL, O&M Circle Kathua has informed that to carry out the branch cutting of trees under the corridor of 66 KV Sarna-Kathua Line, the power supply to Keerian Local, Industry (Crushers), CNC Keerian and adjoining areas will remain affected on November 05 from 9 am to 2 pm. 

Similarly, to carry out the branch cutting of trees under the corridor of 66 KV Pathankot-Kathua Line, the shutdown of shutdown of 66 KV Pathankot-Kathua line is being observed.

During the shutdown, the affected load shall be accommodated on Grid Station Kathua.

ADVERTISEMENT

Meanwhile, to execute reconductoring work with Dog/Rabbit and tapping of 11 KV new line in IPDS /PMDP Scheme, the power supply to Garib Basti, Lakhanpur Bazar, Goplden Gate, Mahabti, Kattal Chowk etc will remain affected on November 03, 05, 07, 09 from 9 am to 2 pm.

However, for testing of CT/PT Units, the power supply to all Industry Units on 11 KV Industry-II, IGC-I Phase-I, Samba will remain affected on November 05 from 12 noon to 2 pm.

Similarly, the power supply to all Industry Units on 11 KV Industry-V, IGC-I Phase-I, Samba will remain affected on November 05 from 1 pm to 4 pm.

Previous Post

Director AH reviews implementation of Govt schemes in Poonch district

Next Post

Application Filed Before SC Seeking Early Hearing of Pleas Challenging Changes Made to Article 370

Kashmir Pen

Kashmir Pen

Next Post
SC asks Centre to clarify stand on interest waiver during moratorium

Application Filed Before SC Seeking Early Hearing of Pleas Challenging Changes Made to Article 370

Leave Comment
ADVERTISEMENT
Facebook Twitter Youtube RSS

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ

No Result
View All Result
  • Home
  • Latest News
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ