• About
  • Advertise
  • Jobs
Monday, May 11, 2026
No Result
View All Result
KashmirPEN
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
KashmirPEN
No Result
View All Result
ADVERTISEMENT
Home Latest News

Amid soaring temperatures, JK faces ‘lopsided power supply, demand’

Kashmir Pen by Kashmir Pen
11 months ago
in Latest News, State News
Reading Time: 2 mins read
New Curtailment schedule with less Power cuts on cards this winter
0
SHARES
4
VIEWS
Share on FacebookShare on Twitter

Srinagar, Jun 20: Amid soaring temperatures, Jammu and Kashmir Power Development Department (PDD) is facing lopsided power supply and demand—thus pushing thousands to face the scorching heat wave.

An official informed the news agency—Kashmir News Observer (KNO) that there is a power demand of over 3000 Megawatts across Jammu and Kashmir.

“From the Jammu division, there is a power demand of more than 1600 MW and in the case of Kashmir division, we are getting a power demand of approximately 1350-1400 MW of power. Currently, we are catering nearly 2800 MWs of power,” the official said.

The official further said: “There is a power deficiency of nearly 150 MW from the Baglihar Hydroelectric Power Project wherein we are currently producing only 750 MWs of power. Usually during this season we were producing 900 MWs of power but due to the low water level we are utilizing only five plants out of six and are currently able to generate only 750 MWs.”

ADVERTISEMENT

He also said that the department was generating a maximum of 900 MW of power from Baglihar Hydroelectric Power Project. “A maximum of 900 MWs and minimum of 848 MWs of power is being generated from all phases of this power plant,” he added.

The official said that it was producing 210 lakh units of energy per day from our 13 generation stations.

In Jammu and Kashmir there is a total of nearly 1200 MWs hydel power production capacity of which 900 MW is from the Baglihar Hydroelectric Power Project—(KNO)

Previous Post

CM Omar Abdullah Inaugurates ‘Raabita’ Public Outreach Office in Jammu

Next Post

10-days summer break for Kashmir schools from July-01: Edu Minister Itoo

Kashmir Pen

Kashmir Pen

Next Post
Summer vacations in Jammu division from Tomorrow

10-days summer break for Kashmir schools from July-01: Edu Minister Itoo

Leave Comment
ADVERTISEMENT
Facebook Twitter Youtube RSS

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ

No Result
View All Result
  • Home
  • Latest News
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ