• About
  • Advertise
  • Jobs
Thursday, May 21, 2026
No Result
View All Result
KashmirPEN
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
KashmirPEN
No Result
View All Result
ADVERTISEMENT
Home Latest News

Indian Railways approves Rs 238 crore safety works on Jammu-Katra section

Kashmir Pen by Kashmir Pen
2 days ago
in Latest News, State News
Reading Time: 1 min read
Indian Railways approves Rs 238 crore safety works on Jammu-Katra section
0
SHARES
3
VIEWS
Share on FacebookShare on Twitter

Jammu, May 19: Indian Railways has approved the critical slope stabilisation, tunnel rehabilitation and bridge protection works on the Jammu-Shri Mata Vaishno Devi Katra section of Northern Railway at a cost of ₹238 crore.

ADVERTISEMENT

The approved works include slope stabilisation, rehabilitation measures, treatment of tunnel seepage issues, bridge protection works, and other related safety interventions at vulnerable locations along the Jammu-Shri Mata Vaishno Devi Katra route.

The Union Minister for Railways, Ashwini Vaishnaw, has said that these works reflect the Government’s commitment to ensuring safe and reliable connectivity in the most challenging terrains of the country.

Vaishnaw said that following a detailed assessment of cuttings, bridges and tunnels, protection and rehabilitation works have been sanctioned. He said these works will strengthen the long-term safety and reliability of this strategically important section.

The section has faced several engineering and operational challenges due to difficult terrain, adverse geological conditions, and extreme weather events. However, Indian Railways has consistently overcome these challenges through timely execution and resilient infrastructure development.

With the sanctioning of new protection and rehabilitation works for the existing infrastructure, the route is set to become more resilient than ever, ready to serve the millions who travel it each year with greater safety and confidence.

Previous Post

Sheikh Al-Hudhaify to deliver Hajj Khutba

Next Post

Drug Trade Funding Terrorism, Will Eradicate Network : LG Sinha

Kashmir Pen

Kashmir Pen

Next Post
Drug Trade Funding Terrorism, Will Eradicate Network : LG Sinha

Drug Trade Funding Terrorism, Will Eradicate Network : LG Sinha

Leave Comment
ADVERTISEMENT
Facebook Twitter Youtube RSS

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ

No Result
View All Result
  • Home
  • Latest News
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ