• About
  • Advertise
  • Jobs
Wednesday, June 3, 2026
No Result
View All Result
KashmirPEN
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
  • Home
  • Latest NewsLive
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry
KashmirPEN
No Result
View All Result
ADVERTISEMENT
Home Latest News

KPDCL announces power shutdown in Kashmir parts

Kashmir Pen by Kashmir Pen
8 months ago
in Latest News, State News
Reading Time: 2 mins read
Power shutdown
0
SHARES
8
VIEWS
Share on FacebookShare on Twitter

According to the Chief Engineer, Distribution, KPDCL, shutdown of 132 KV Grid Substation Pampore-(132 & 33 KV Switchyard) and 132 KV ICT Ckt-I & II Konibal will be observed due to which Lethpora, Kakapora, Newa, Pinglena, Tenghar, Pulwama, Kadlabal, Pahroo, Samarbugh, Shar Shali, JK Cements, Pampore-I, Pampore-II, Govt. Press, Panthachowk, and Lasjan receiving stations shall remain off while power supply to Konibal, Lethpora, Kakapora, Newa, Pinglena, Tenghar, Pulwama, Kadlabal, Pahroo, Samarbugh, Shar Shali, Cement Factories, Govt. Press, Panthachowk, Lasjan and adjoining areas will be affected from 09.00 AM to 03.30 PM on 18 October, 2025.

ADVERTISEMENT

Similarly, shutdown of 132 KV Grid Substation Rawalpora (132 & 33 KV Indoora Switch Yard) shall be observed due to which Rawalpora, Chanapora, Peerbagh, Bones & Joint Hospital, Bagh-i-Mehtab, B.K Pora, Khanda, Wanbal, Doodganga, Rangreth, JKLAI, BEACON, FIL Industries, RASU and Airforce receiving stations shall remain off while power supply to Rawalpora, Chanapora, Peerbagh, Bones & Joint Hospital, Bagh-i-Mehtab, B.K Pora, Khanda, Wanbal, Doodganga, Rangreth, JKLAI, BEACON, Airforce and adjoining areas will be affected on 25 October 2025 from 09.00 AM to 03.30 PM.

Likewise, 220 KV Amargarh Zainakote Circuit-I & II. Bemina-I, Bemina-II will be observed due to which Tengpora, GIS Batamaloo, Basant Bagh, Barbarshah, Fatehkadal, Khayam, Karan Nagar, Shalistore, Singhpora, Mirgund, Nihalpora, Shadipora, Pattan, Palhallan, Hamray, Aglar, Shahgund, Naidkhai, Markundal, Wanganpora, Kawdara, Mughal Masjid, Safakadal, Takanwari, Zoonimar, Soura, New Soura, M.R Gunj, SH Pora, and Shreen Bagh receiving stations shall remain off while power supply to Bemina, Tengpora, Batamaloo, Basant Bagh, Barbarshah, Fatehkadal, Khayam, Karan Nagar, Shalistore, Singhpora, Mirgund, Nihalpora, Shadipora, Pattan, Palhallan, Hamray, Aglar, Shahgund, Naidkhai, Markundal, Wanganpora, Kawdara, Mughal Masjid, Safakadal, Takanwari, Zoonimar, Soura, M.R Gunj, SH Pora, Shreen Bagh and adjoining areas will be affected on 20 October, 2025 from 09.00 AM to 03.30 PM.

Similarly, shutdown of 33 kv Ahmadpora Beerwah line and 33 KV Ahmadpora Magam line will be observed due to which Beerwah, Arizal, Khag, Magam, Aripanthan and Mazhama receiving stations shall remain off while power supply to Sail Gondipora, Old Beerwah, Arwah, Najan, Chowdara, Beerwah, Hospital, Zanigam, Arizal, Raiyar, Doodhpathri, Khag, Poshker, Sursh, Sujan, Old Sanoor, Aripanthan, Magam, Wariahama, Burden and adjoining areas will be affected on 22 October, 2025 from 09.00 AM to 03.30 PM.

Likewise, shutdown of 33 KV Arizal Tapline with be observed due to which Arizal receiving station shall remain off while power supply to Arizal, Zanigam, Raiyar, Doodhpathri and adjoining areas will be affected from 10.00 AM to 03.30 PM on 25 October, 2025.

Previous Post

Traffic Police Sub-Inspector critically injured after motorcycle hits him near Bakshi Stadium

Next Post

MEA announces transition to reinstating embassy in Afghanistan in “next few days”

Kashmir Pen

Kashmir Pen

Next Post
MEA announces transition to reinstating embassy in Afghanistan in “next few days”

MEA announces transition to reinstating embassy in Afghanistan in “next few days”

Leave Comment
ADVERTISEMENT
Facebook Twitter Youtube RSS

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ

No Result
View All Result
  • Home
  • Latest News
  • State News
  • COVID-19
  • Kashmir
  • National
  • International
  • Education
  • Sports
  • Entertainment
  • Technology
  • Weekly
    • Perception
    • Perspective
    • Narrative
    • Concern
    • Nostalgia
    • Tribute
    • Viewpoint
    • Outlook
    • Opinion
    • Sufi Saints of Kashmir
    • Personality
    • Musing
    • Society
    • Editorial
    • Analysis
    • Culture
    • Cover Story
    • Book Review
    • Heritage
    • Art & Poetry

©2020 KashmirPEN | Made with ❤️ by Uzair.XYZ